THE PROVEN PROCESS

We get involved early, architect the system, and own the outcome. No handoffs. No finger-pointing. Just a line that works.

01

Define the Problem

We start by listening. Together, we identify your production challenges, operational constraints, and business goals. We define the problem before we talk about equipment.

Key Deliverable

Problem statement, objectives, and shared success criteria

02

System Architecture

We architect the system and select equipment OEM-agnostically. We design for flow, accumulation, and operator access. We create a detailed layout that fits your plant.

Key Deliverable

Integrated layout, equipment selection, and budgetary proposal

03

Integration & FAT

We integrate all components and own the Factory Acceptance Test (FAT). We ensure the system runs as designed before it leaves our floor. We don't ship problems.

Key Deliverable

Fully tested system ready for shipment

04

Install & Commission

We coordinate installation and commission the line. We stay until it runs at rate. We train your team and ensure a smooth handover.

Key Deliverable

Production-ready line and trained operators

05

Long-Term Support

We support you long after the install. We offer remote diagnostics, spare parts, and field service to keep your line running at peak performance.

Key Deliverable

Ongoing partnership and support

PROJECT TIMING & LEAD TIMES

01

Equipment Lead Times

Major capital equipment currently requires a 6–12 month horizon. Early selection secures production slots and protects your schedule.

02

Engineering & Design

Front-end engineering ensures integration details are solved before metal is cut, preventing costly field modifications and delays.

03

Installation Windows

We align installation with planned shutdowns and production schedules to minimize operational disruption and downtime.

Start Planning for 2026-2027

Early integration planning protects both schedule and capital. Let's review your current floor plan and identify automation potential.